Fire Breaks Out at Halim Station of Jakarta-Bandung High-Speed Train

Share:

In the early hours of Monday, the 11th of September, at 12:30 a.m. Jakarta time, a fire incident occurred at Halim Station of the Jakarta-Bandung high-speed train. Fortunately, the authorities’ prompt action prevented significant disruptions to the station’s operations.

PT Kereta Cepat Indonesia China (KCIC) GM Corporate Secretary Eva Chairunissa confirmed that the situation at Halim Station is under control and assured that there would be no operational disruptions affecting the high-speed train’s trial schedule.

Eva Chairunissa stated, “There is no operational disruption. The trial schedule will stay on track.” She went on to provide further details about the incident, assuring that the interior of the station building remains in good condition, allowing all functions to operate normally.

The incident was attributed to an electric spark on the roof of the east side of the train platform, specifically in the roofing protection layer. KCIC swiftly coordinated with the East Jakarta Fire Department, and their efforts successfully extinguished the fire, preventing significant damage.

Fire Breaks Out at Halim Station of Jakarta-Bandung High-Speed Train
Source detik.com

The quick response by both KCIC and the local fire department played a crucial role in minimizing the impact of the incident. The safety measures in place at Halim Station were instrumental in preventing the fire from spreading and causing substantial harm.

Eva Chairunissa praised the collaborative efforts of all parties involved in resolving the situation swiftly and ensuring the safety of passengers and station personnel. She emphasised that the incident would not affect the ongoing trial schedule of the Jakarta-Bandung high-speed train.

The Jakarta-Bandung high-speed train project, a joint venture between Indonesia and China, is a significant infrastructure development to improve transportation connectivity and reduce travel time between the two cities. The successful management of the incident underscores the commitment of the authorities and organisations involved to maintain the project’s progress and safety standards.

While the investigation of the exact cause of the electric spark continues, it is evident that the well-coordinated response has prevented any significant setbacks to the high-speed train project. Passengers and stakeholders can rest assured that the safety and operational integrity of the Jakarta-Bandung high-speed train remains a top priority.

Interested in this topic? Check out our other articles from Social Expat: 

Content Writer

Being in love with writing at a young age, Anasya is eager to play with words and touch hearts. She’s been a content writer for a little over four years and officially be part of Social Expat in March 2023. Her perfectionism drives her to give her best on every project she handles.

Related News

Glitz Production is set to present the hit Broadway show Dreamgirls The Musical at Glitz Inclusive, Kuningan City, from 27 November to 7 December. The show celebrates the voices and stories of women in the performing arts. SocialExpat is among the lucky ones to attend the premiere on 27 November 2025. A Modern and Inclusive […]

Jakarta has been named the world’s most populous city, according to the United Nations Department of Economic and Social Affairs in its latest report released on 23 November 2025. The report, World Urbanization Prospects 2025: Summary of Results, states that the Indonesian capital now has 41.9 million residents. The UN notes that rapid urbanisation has […]

Indonesia and South Africa have formally agreed to implement a reciprocal visa-free policy for their citizens. Vice President Gibran Rakabuming Raka confirmed the announcement during the Indonesia–Africa CEO Forum at the Saxon Hotel in Johannesburg on Friday, 21 November 2025. Gibran was in South Africa to attend the G20 Summit on behalf of President Prabowo […]

The Meteorology, Climatology and Geophysics Agency (BMKG) reports that the extreme weather affecting several regions of North Sumatra over the past week is linked to Tropical Cyclone Senyar. Head of BMKG Region I, Hendro Nugroho, stated that Senyar originated from tropical cyclone seed 95B which developed in the Malacca Strait on 21 November 2025. “Over […]

Expat Property

Indonesia Visas

Expat Event

Business Networking
150,000
Jaba Lounge at Fairfield by Marriott Bali Kuta Sunset Road
Social Networking Event
150,000
Copper.30
Business Networking
150,000
Casa Cuomo Ristorante & Lounge

Indonesia Guide

Just For Fun

Write For Us

Exclusive Promotions

Event Gallery